ICEM Project

Rafal Tower, Riyadh

ICEM Projects

Rafal Tower– Riyadh, KSA

The Design Review and quality control for the installation of advanced energy efficient cooling system in Rafal Tower-Riyadh was done by ICEM.

The skyscraper which claims to be the tallest residential tower in the capital houses Riyadh’s first vertically integrated residential community, a five-star luxury hotel – Burj Rafal Hotel Kempinski – as well as retail outlets within its 70 storeys.

ICEM Project
ICEM Project

Mobily Data Center – RIYADH & JEDDAH, KSA

ICEM Projects

Mobily Data Center - RIYADH & JEDDAH, KSA

ICEM developed several Data Centers for the telecom giant Etihad Etisalat Mobily. These technical buildings are developed according to the latest norms, standards and with highest energy efficiency.

Mobily Data Center Project- Melgha 2, Mobily Data Center- AlKhobar, Mobily POP Rawdha-Jeddah, and Mobily Technical Building Jeddah-3 are the major projects ICEM handled for Mobily.

The flagship project ‘Mobily Data Center Project- Melgha 2’ has won world certifications such as the Uptime Institute Tier IV TM and Tier III TM. (Uptime Institute is a world institute specialized in the evaluation of data centers all over the world.) This is one of the best and the first TIER IV Data Center of Mobily in Kingdom.

ICEM Project
ICEM Project

Al-Rajhi Tower – RIYADH, KSA

ICEM Projects

Al-Rajhi Tower - RIYADH, KSA

Full MEP and Energy system Design was done for this award winning high rise building for Al-Rajhi- a major banking Institution in Riyadh, Kingdom of Saudi Arabia.

ICEM together with SOM (USA) developed the full tender and construction package for the MEP and Structural Services for this prestigious building in Riyadh. ICEM also developed a full DSM and Load Shifting TES system based on ice storage for this project.

ICEM Project
ICEM Project

New Parliament Building Astana, Kazakhstan

ICEM Projects

New Parliament Building Astana, Kazakhstan

Since becoming the new capital of the Republic of Kazakhstan, Astana has witnessed the construction of many new buildings including the new Parliament Building.

Designing the M&E services was interesting and exciting as the outside air temperature in Astana can be as low as – 33ºC in the winter and as high as + 35ºC during the summer.

ICEM Project