New Parliament Building Astana, Kazakhstan


Since becoming the new capital of the Republic of Kazakhstan, Astana has witnessed the construction of many new buildings including the new Parliament Building.

Designing the M&E services was interesting and exciting as the outside air temperature in Astana can be as low as - 33ºC in the winter and as high as + 35ºC during the summer.









Go Back
Projects

Some of our on-going and successfully completed Projects:


    ICEM - KSA

  •   Farah Building, Opposite Riyadh
         Palace Hotel, P.O.Box 22864
         Riyadh 11416, Saudi Arabia
  •   +966 11 412 2317
  • info@icemsolutions.com

    Energistics - UAE

  •   PO Box: 31436, Office 1612
         Metropolis Tower, Business Bay
         Dubai, UAE
  •   +971 4 321 6631
  • info@icemsolutions.com

About ICEM

The engineering Practice registered in the Kingdom of Saudi Arabia under the name of International Consortium for Energy Management (ICEM) under the investment regulations of SAGIA, specialising in design-built of energy management systems.


Read more