ICEM Projects
Saudi French Bank Head Quarters - RIYADH, KSA
The first TES System in the Middle East.
The first Demand Side Management and Load Shifting (DSM&LS) System on the Power Consumption sector was installed at the Saudi French Bank in 1993. The success of this project was followed through with ten such DSM &LS Projects in the Kingdom.